Skip to main content
Home
Home

  • People
  • Events
    USMCA Flags
    Claudio X. González Center for the US and Mexico
    Thu, July 09, 2026 | 10 am - 11 am
    The State of Negotiations of the USMCA See Details
    AIHC New
    Science and Technology Policy
    Tue, Sep. 15 - Thu, Sep. 17, 2026 | 8 am - 6 pm
    AI in Health Conference See Details
    SynBio-Crop
    Science and Technology Policy
    Fri, Sep. 18, 2026 | 9 am - 5 pm
    Synthetic Biology at the Intersection of Science, Ethics, and Policy See Details
  • Podcasts
  • Research Programs
  • Research & Commentary
  • Press
  • Support
  • About
  • Newsletter
  • Search
  • Research
  • Twitter
  • Facebook
  • instagram
  • Linkedin
  • Youtube
  • Newsletter
  • Economics & Finance
  • Energy
  • Foreign Policy
  • Domestic Policy
  • Health & Science
  • All Publications
Center for Energy Studies | Journal

Optimal Transmission Planning Under the Mexican New Electricity Market

February 16, 2017 | Eric Zenón, Juan Rosellón
Transmission towers against a sunset.

Table of Contents

Author(s)

Eric Zenón

Centro del Cambio Global y la Sustentabilidad en el Sureste (CCGSS)

Juan Rosellón

Nonresident Fellow

Share this Publication

  • Facebook
  • Twitter
  • Email
  • Linkedin
  • Print This Publication

Tags

Baker InstituteMexicoEnergy reformsElectricity

Abstract

This paper addresses electricity transmission planning under the new industry and institutional structure of the Mexican electricity market, which has engaged in a deep reform process after decades of a state-owned-vertically-integrated-non-competitive-closed industry. Under this new structure, characterized by a nodal pricing system and an independent system operator (ISO), we analyze welfare-optimal network expansion with two modeling strategies. In a first model, we propose the use of an incentive price-cap mechanism to promote the expansion of Mexican networks. In a second model, we study centrally-planned grid expansion in Mexico by an ISO within a power-flow model. We carry out comparisons of these models which provide us with hints to evaluate the actual transmission planning process proposed by Mexican authorities (PRODESEN). We obtain that the PRODESEN plan appears to be a convergent welfare-optimal planning process.

Read the full article in Energy Policy.

https://doi.org/10.1016/j.enpol.2017.02.006
  • Print This Publication
  • Share
    • Facebook
    • Twitter
    • Email
    • Linkedin

Related Research

3d wireframe model of a broken chain with random numbers.
Center for Energy Studies | Issue Brief

Sustainability in a Fragmented Global Economy: Managing Trade-Offs Across Interconnected Systems

Read More
EMEC1
Center for Energy Studies | Press Release

Rice’s Baker Institute launches Eastern Mediterranean Energy Center with US Department of Energy

Read More
Oil Field. Winter industrial landscape with an oil pump and torch in the background.
Center for Energy Studies | Issue Brief

How Declining Oil Production Could Weaken Russia’s Geopolitical Power

Read More
  • Contact Us
  • Donate Now
  • Press
  • Membership
  • Careers
  • Student Opportunities
  • About the Institute
  • Rice.edu

6100 Main Street
Baker Hall MS-40, Suite 120
Houston, TX 77005

Email: [email protected]
Phone: 713-348-4683
Fax: 713-348-5993

  • Twitter
  • Facebook
  • instagram
  • Linkedin
  • Youtube
  • Newsletter
  • © Rice University's Baker Institute for Public Policy
  • Web Accessibility
  • Privacy Policy